Glow-worm Easicom Manuel d'utilisateur Page 5

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 20
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 4
0020140414_01 - 02/12 - Glow-worm
- 3 -
READ CAREFULLY BEFORE USING
READ CAREFULLY BEFORE USING
1 Read me
1.1 Welcome
These instructions are an integral part of
the boiler and must, to comply with the
current issue of the Gas Safety (Installation
and Use) Regulations, be left with the user.
Please ensure that the installer has fully
completed the Benchmark Checklist in the
centre pages of the installation instructions
supplied with the product and that you
have signed it to say that you have received
a full and clear explanation of its operation.
The installer is legally required to complete
a commissioning checklist as a means of
complying with the appropriate Building
Regulations (England and Wales).
All installations must be notied to Local
Area Building Control either directly or
through a Competent Persons Scheme. A
Building Regulations Compliance Certicate
will then be issued to the customer who
should, on receipt, write the Notication
Number on the Benchmark Checklist.
• Please read these instructions and
follow them carefully for the safe and
economical use of your boiler.
i
IMPORTANT:
Donotforgettoreadthechapters
“Safety”and“Guarantee”where
youwillndimportantinformation
foryoursafety.
1.2 Guarantee Pack
The pack contains the letter of introduction
and the guarantee. The extended guarantee
is supplied loose and we recommend that
you should read it.
• Complete and return as soon as possible
your guarantee registration card.
If your guarantee registration card is
missing you can obtain a copy or record
your registration by telephoning
the Glow-worm Customer Service number
0800 073 2142.
1.3 Servicing
This product should be serviced regularly
to optimise its safety, eciency and
performance. The service engineer should
complete the relevant Service Record on
the Benchmark Checklist after each service.
The Benchmark Checklist may be required
in the event of any warranty work and as
supporting documentation relating to home
improvements in the optional documents
section of the Home Information Pack.
To ensure the continued ecient and safe
operation of the boiler it is recommended
that it is checked and serviced at regular
intervals. The frequency of servicing will
depend upon the site conditions and
usage, but in general, once a year should
be enough.
• To obtain service, please call your
installer or Glow-worm’s own service
organisation.
1.4 Benchmark
Glow-worm is a licensed member of
the Benchmark Scheme which aims to
improve the standards of installation and
commissioning of domestic heating and hot
water systems in the UK and to encourage
regular servicing to optimise safety,
eciency and performance.
Benchmark is managed and promoted by
the Heating and Hotwater Industry Council.
• For more information visit
www.centralheating.co.uk
Vue de la page 4
1 2 3 4 5 6 7 8 9 10 ... 19 20

Commentaires sur ces manuels

Pas de commentaire