Glow-worm Ultimate 30FF Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Chaudière à eau Glow-worm Ultimate 30FF. Glow-worm Ultimate 30FF User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 40
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
4098
221518L.12.04
All replacement parts
All labour charges
All call-out charges
Guarantee Registration
Fanned Flue Boiler
(SIT)
This is a Cat I
2H
Appliance
BS 6332
BS 5258
Reference in these instructions to British Standards and Statutory
Regulations/Requirements apply only to the United Kingdom.
For Ireland the rules in force must be used.
To be left with the user
Instructions for Use
Installation and Servicing
G.C. No. 41 047 07
REGISTER YOUR GLOW-WORM APPLIANCE
FOR 1ST YEAR GUARANTEE PROTECTION
CALL 0800 073 2142
30FF
Tel: (01773) 828100
Fax: (01773) 828070
Glow-worm,
Nottingham Road, Belper, Derbyshire. DE56 1JT
General/Sales enquiries:
Tel: (01773) 824141 Fax: (01773) 820569
www.glow-worm.co.uk
Thank you for installing a new Glow-worm appliance in your home.
Glow-worm appliances' are manufactured to the very highest standard so we are pleased
to offer our customers' a Comprehensive First Year Guarantee.
We recommend you complete and return your Guarantee Registration Card as soon as possible.
If this card is missing you can obtain a copy or record your registration by telephoning the Glow-worm Customer
Service number 01773 828100.
Our Guarantee gives you peace of mind plus valuable protection against breakdown by covering the cost of:
The instructions consist of three parts, User, Installation and Servicing Instructions.
The instructions are an integral part of the appliance and must, to comply with the current issue of the
Gas Safety (Installation and Use) Regulations, be handed to the user on completion of the installation.
Vue de la page 0
1 2 3 4 5 6 ... 39 40

Résumé du contenu

Page 1 - Installation and Servicing

4098221518L.12.04All replacement partsAll labour chargesAll call-out chargesGuarantee RegistrationFanned Flue Boiler(SIT)This is a Cat I2H ApplianceBS

Page 2 - Important Information

10221518L3 Water SystemsDiagram 3.2Diagram 3.30090M1m MIN.27m Max.PUMPHEATINGSYSTEMINDIRECTCYLINDER(Shown withrecommendedthermostat and valve).22mm VE

Page 3

11221518LDiagram 3.53 LITRES (0.66 gals)MAKE-UP BOTTLE(if required)NON-RETURNVALVEAUTOAIRVENTFLOWDRAINCOCKBOILERSAFETYVALVE(Make-upalternatives)EXPANS

Page 4

12221518L3 Water SystemsMETHOD 1METHOD 2METHOD 3SUPPLY STOPVALVESUPPLYPIPEHOSEUNIONSSERVICINGVALVETEMPORARYHOSEHEATINGSYSTEMHEATINGSYSTEMTEMPORARYHOSE

Page 5 - 1 General Data

13221518L4 Flue and Appliance PreparationDiagram 4.1Diagram 4.2Diagram 4.3Standard Flue terminal illustrated.Standard Flue terminal illustrated.682768

Page 6

14221518LDiagram 4.55mmTEMPLATEFLUECENTRELINEBOILERMOUNTINGBRACKETBOILERCENTRELINEMOUNTINGBRACKET FIXINGPOINTSFLUECENTRELINEBOILERCENTRELINETOP BOILER

Page 7

15221518L4 Flue and Appliance PreparationDiagram 4.6Diagram 4.7FLUEDUCTBOILERCENTRELINET MINUS 188mm68336831QDiagram 4.8LONG FLUETERMINALSTANDARD FLUE

Page 8 - 2.2 Terminal Guard

16221518LDiagram 4.10AIR DUCT/TERMINALAND FLUE DUCTASSEMBLY46164 Flue and Appliance PreparationDiagram 4.9BOILERCENTRELINELONG FLUETERMINALSTANDARDFLU

Page 9 - (mm head of water)

17221518L4 Flue and Appliance PreparationDiagram 4.11Diagram 4.12FOAMSEALFOAMSEALWALL THICKNESS-OVER 300mm10mmWALL THICKNESS-UP TO 300mmQ-25mmQQGASKET

Page 10 - CYLINDER

18221518L5 Boiler InstallationDiagram 5.2Diagram 5.1CONTROLSCOVERWINGNUTFRONTCOVERSHAKEPROOFWASHER22mm HEATINGRETURN22x28 GRAVITYDOMESTICCONNECTION✽22

Page 11 - 3 Water Systems

19221518L5 Boiler InstallationDiagram 5.4ELECTRICALCONNECTIONSREAR SECURING SCREW (2)(SLACKEN but do not remove)4084AIR PRESSURE TUBESCLEARREDSECURING

Page 12

2221518LTesting and CertificationThis boiler is tested and certificated for safety and performance. It is therefore important that no alteration is m

Page 13 - SIDE FLUE LENGTHS

20221518LDiagram 5.6Diagram 5.75 Boiler InstallationFLUEMANIFOLDSPIGOT(REAR FLUE OUTLET ILLUSTRATED)VERTICALREARRIGHTLEFTSCREW(2)JUBILEECLIPCutting &a

Page 14 - 4.5 Flue Hole Cutting

21221518LDiagram 5.85 Boiler InstallationSECURINGSCREWS (2)5739LIP BRACKET5.10 External ControlsMake sure that the supply cable and all external cable

Page 15 - 4.6 Wall Mounting Bracket

22221518L6 CommissioningPlease ensure the “Benchmark” logbook is completed and leftwith the user.6.1 All SystemsCommissioning should be carried out by

Page 16 - 4.11 Side Fitting

23221518L6 CommissioningDiagram 6.3Diagram 6.4NOTE:PILOT SHIELDREMOVED FORCLARITYSPARK GAP2 to 4mm10 to 20mm FLAME LENGTH4138VIEWINGWINDOWSECURINGSCRE

Page 17 - 4.13 Internal Access Flue

24221518L6 CommissioningDiagram 6.5Diagram 6.6CONTROLSCOVERSLIDERSWINGNUTWASHERTOPSEALSIDESEALNOTE: MAKE SUREOF CORRECTENGAGEMENTNUT408141406.6 Testin

Page 18 - 5 Boiler Installation

25221518L7 Instructions to the UserDiagram 8.1Diagram 8.2BAFFLE(6 off)SECURING SCREW REAR (2)(KEYHOLE SLOTS, SLACKEN SCREW)FLUEHOODSECURING SCREW (2)7

Page 19 - 0167(a)M

26221518L8 ServicingDiagram 8.4Diagram 8.5Diagram 8.6WING NUTMAINBURNERINJECTORPILOTBURNERSPRINGCLIPELECTRODEPILOTINJECTOR414141424143Diagram 8.3SECUR

Page 20

27221518LDiagram 9.19 Fault FindingNEONINDICATORSNeon Indicators - An Aid to Fault FindingTHE NEON INDICATORS ARE AN AID TO FAULT FINDING ONLY. FAILU

Page 21

28221518LDiagram 9.29 Fault FindingIs neon 1 lit?Is neon 2 lit?Correct power supply problem.Is there 230V~between 3 on thermostat and N ?Repl

Page 22 - 6 Commissioning

29221518L9 Fault FindingDoes pump continue to run afterSL is interrupted?YESDoes pump stop after severalminutes?System satisfactory.Faulty PCB. Repla

Page 23

3221518L4140Diagram 14625CONTROLS COVERDATA &SERIALNUMBERLABELRESETBUTTONVIEWING WINDOWSETTING POINTCONTROLTHERMOSTATKNOBGAS SERVICECOCK (ShownOff

Page 24

30221518L9 Fault FindingFUSETYPE F1 & F2(F1A)AIR PRESSURE SWITCH CONNECTIONSSPARKELECTRODEO/H CUTOFFCONTROL STATFANAIRPRESSURESWITCHPILOTSOLENOIDM

Page 25 - 8 Servicing

31221518L9 Fault FindingDiagram 9.6KEY:b-BLUEbk - BLACKbr - BROWNg/y - GREEN/YELLOWor - ORANGEp-PURPLEr-REDy-YELLOWw-WHITEFANrryCNONCCHASSIS EARTHSLNL

Page 26

32221518L9 Fault FindingDiagram 9.7SWITCH CONTROL,TIME SWITCH,PROGRAMMER ETC.(if fitted)CNOL9wywg/yK1K2FANg/yrrbkyAIRPRESSURESWITCHCHASSIS EARTHg/ywg/

Page 27 - 9 Fault Finding

33221518L10 Replacement of PartsCONTROLTHERMOSTATCONTROLKNOBELECTRICALCONNECTIONSYELLOW 2 & 3SPLITGROMMETRETAININGCLIPLOCKNUTELECTRICALCONN

Page 28

34221518LDiagram 10.210 Replacement of PartsRETAININGCLIPCONTROLTHERMOSTATPHIALPHIALRETAININGBRACKETSECURINGSCREWOVERHEATCUTOFFDEVICEPHIALSPLITPINGLAN

Page 29

35221518LELECTRICALPLUGPILOT PIPETUBING NUTEXTENDEDSECURINGSCREWS (8)RESTRICTORSECURINGSCREW10 Replacement of Parts10.8 Solenoid - diagram 10.3Remove

Page 30

36221518LDiagram 10.5FRONT INSULATIONRETAININGSCREWSIDE INSULATIONREAR INSULATION410010 Replacement of Parts10.11 Insulation - diagram 10.5Combustion

Page 31

37221518LDiagram 10.710 Replacement of PartsREDCLEARAIR PRESSURESWITCH TUBESSECURINGSCREWSAIRPRESSURESWITCHELECTRICALCONNECTIONSCONTROLBOX412210.13 Ai

Page 32

38221518L11 Spare Parts11.1 Part IdentificationThe key number on the diagram and the list will help to identifythe part.11.2 OrderingWhen ordering any

Page 33 - 10 Replacement of Parts

39221518LDiagram 11.17910126451098711131415311 Spare Parts

Page 34

4221518L500mmAdditional clearances may berequired for installation65mm6mm6mmFRONTVIEW100mm0081MSIDE ORREAR FLUE5mm5mmDiagram 2Instructions for UseBoil

Page 35

40221518LBecause of our constant endeavour for improvement, details may vary slightly from those shown in these instructions.

Page 36

5221518L1 General DataDiagram 1.1All dimensions are given in millimetres(except as noted)SIDE ELEVATION FRONT ELEVATIONJLMCLDNFGGHHFLOWGRAVITYRETURNPU

Page 37

6221518L1 General Data1.4 B.S.I. CertificationThis boiler is certificated to the current issue of British Standard6332 Part 1, invoking the current is

Page 38 - 11 Spare Parts

7221518LMINIMUM CLEARANCES FROM WALLS,CEILING, FLOOR, CUPBOARD, WORKTOPSAND INFLAMMABLE MATERIALSDiagram 1.3500mmAdditional clearances may berequired

Page 39

8221518L2 Flue and VentilationAAFGEAGGGB,CB,CFFKKKCGLLDiagram 2.1 MINIMUM SITING DIMENSIONS FOR FANNED FLUE TERMINALS POSITIONA DIRECTLY BELOW,

Page 40

9221518LDiagram 3.13 Water Systems100075050025011.50051015 20 25 30Flow rate (litres/minute)Water pressure loss(mm head of water)6809The insertion poi

Commentaires sur ces manuels

Pas de commentaire